Home to work. Here are our base camps

About 70 rooms, each with dedicated services, make up the two “base camps” for workers’ accommodation, one in the construction site near Turin; the other in Bolzano, where work is underway for the Brenner Base Tunnel. The idea is to “bring home” to Italian construction sites, leveraging the spirit of sharing of Geovertical employees. The…

Nuovo sito Geovertical srl

Our new website is online!

We got our look back! We are online with a new graphic design and new contents to better tell who we are, what we do, the precision and passion we put into each job. Five sections, always updated and easily accessible, tell the company, the sectors in which we operate and the means and equipment…

Brenner Base tunnel

Brenner Basistunnel is one of the most important work at the moment. The work includes the construction of a railway tunnel connecting ITALY –AUSTRIA between Fortezza and Innsbruc, which will be 64 km long (a record length) once it will have been completed.

RFI AQ_246 22/12/2014 CA_12/2016

Draining Structural Well

Esecuzione dei lavori per la manutenzione delle opere civili della sede ferroviaria e relative pertinenze di Rete Ferroviaria Italiana SpA di Giurisdizione della Direzione Territoriale Produzione di Reggio Calabria, ricadenti nell’ambito territoriale delle Regioni Calabria, Basilicata e Campania. Contratto Applicativo n°12/2016 Linea Battipaglia – Reggio Calabria: stabilizzazione corpo di frana fra il km 70+00 e 70+200. I^ FASE: POZZO STRUTTURALE DRENANTE.