The works concern the cortical strengthening of the rocky slope at the Cesaronica Gallery.
After the construction site, the intervention phases are as follows:
- clearing and cleaning of the perimeter strip;
- drilling and injection for perimeter nailing;
- installation of the geomat;
- nailing;
- injection;
- cable laying.