Seven thousand linear meters of drilling.
Fifteen thousand square meters of network and nearly twenty thousand linear meters of cable.
These are the numbers of the work carried out by Geoevertical in Folignano for the defense against falling rocks.
A hydraulic drilling machine and a manual pneumatic drilling machine were also used for the work.