Client
Rete Ferroviaria Italiana S.p.A.
Contractor
CIR Ambiente
Subcontractor
GEOVERTICAL S.r.l.
The intervention is located within the final acoustic restoration project and involved the construction of foundation micropiles for the subsequent installation of the soundproofing barrier.
The micropiles were made inside holes provided in the prefabricated plinths and previously installed.
The processing involved drilling the micropile, laying the reinforcement and subsequent injection of the perforation. The quantitiesproducedwereapproximately 18,000 ml.