Client
Provincia di Piacenza
Contractor
GEOVERTICAL S.r.l.
The works were entrusted with minutes of utmost urgency to mitigate the risks due to the hydrogeological instability of the area, to progressive km 15 + 000, 16 + 500 km 20 + 00, km 21 + 100 (and adjacent sections) and to regulate the surface waters of the slope underlying the progressive km 11 + 750.
Mainly the interventions carried out consisted of:
- Rockfallbarriers;
- Cortical strengthening of the slopes with nailing net.