Client
Consorzio di Bonifica Integrale comprensorio Sarno
Contractor
R.C.M. Costruzioni S.r.l.
Subcontractor
GEOVERTICAL S.r.l.
Execution of the works concerning part of the pipeline connecting the bottom drain relative to the built tank and the reservoir of the Corbara riverbed.
The works carried out and in progress of the contract in question are functional to the commissioning of the global hydrogeological system of the flood that looms over the historic center of Sant’Egidio del Monte Albino.
In detail, the work consists in the execution of a free surface pipeline that acts as a drain to the basin collection tank.
The pipeline is made partly with PEAD pipes and partly with prefabricated reinforced concrete pipes. A section of the pipeline will be created using the “PUSH PIPE” technique after having created the flattening chambers on poles and the exit chambers.