Author Archives: Geovertical Srl

You are here:
  1. Home
  2. Article author Geovertical Srl

Voghera-Pavia. Works on the railway line

ProjectsBy Geovertical Srl16 November 2020

As part of the suppression of the level crossing located at km 10 + 864 of the Voghera-Pavia line in the municipality of Castelletto di Branduzzo

A doppio Binario

Bari-Taranto line. Geovertical among subcontractors

NewsBy Geovertical Srl3 November 2020

L’azienda si occuperà dell’esecuzioni di alcuni lavori per conto di CMB, sui cantieri per il raddoppio della linea Ferroviaria Bari- Taranto.

A10. Interventi su viadotto

A10. Work on the viaduct

ProjectsBy Geovertical Srl19 October 2020

Works for the mitigation of hydrogeological risk A10 – km 16 + 350. Geovertical takes care of the interventions to protect the Frana and Beo viaduct pile, through the construction of a Berlin micropile.

Turin underground. The video

NewsBy Geovertical Srl12 October 2020

Geovertical is also involved in the realization of this strategic work for the City of Turin.

Tre Valli Umbre. Rafforzamento pendice

Tre Valli Umbre. Slope strengthening

ProjectsBy Geovertical Srl12 October 2020

The works concern the cortical strengthening of the rocky slope at the Cesaronica Gallery.

Raddoppio Linea Ferroviaria Bari-Taranto

Doubling of the Bari-Taranto railway line

ProjectsBy Geovertical Srl12 October 2020

Execution of the concrete and carpentry work for reinforced concrete works in the construction site that the Client has in progress for “Doubling of the track of the Bari-Taranto railway line, Mungivacca – Noicattaro section including the stations of Triggiano and Capurso”.

1st Section Direction – Genoa. Highly urgent works in the tunnel

ProjectsBy Geovertical Srl24 September 2020

The works, entrusted in a very urgent regime, involved maintenance interventions inside the tunnels present in the network under the responsibility of the 1st Section – Genoa Directorate, in the A26 Genoa Voltri – Gravellana Toce sections and its branches, A10 Genoa – Savona, A12 Genoa – Sestri Levante, A7 Genoa – Serravalle.

Avalanche defense. The construction site in the province of Belluno is underway

NewsBy Geovertical Srl19 September 2020

The goal – the technicians explain – is to work in close synergy with the contracting authority to maximize the construction of a work whose site falls within a residential area.

Somma urgenza Civitavecchia

Work with utmost urgency, A12 motorway section loc. Civitavecchia

ProjectsBy Geovertical Srl15 September 2020

The works, entrusted with the utmost urgency to Geovertical, consist in the consolidation of the motorway embankment facing the section of the A12 km. 60, loc. Civitavecchia, affected by a subsidence.

Alta Velocità Tratta Milano-Verona

Milan / Verona. Geovertical works in progress

NewsBy Geovertical Srl15 September 2020

Geovertical will take care of the conveyor belts of the mud, thanks to the consolidated experience in the construction sites for the Brenner Base Tunnel.