Voghera-Pavia. Works on the railway line
As part of the suppression of the level crossing located at km 10 + 864 of the Voghera-Pavia line in the municipality of Castelletto di Branduzzo
As part of the suppression of the level crossing located at km 10 + 864 of the Voghera-Pavia line in the municipality of Castelletto di Branduzzo
L’azienda si occuperà dell’esecuzioni di alcuni lavori per conto di CMB, sui cantieri per il raddoppio della linea Ferroviaria Bari- Taranto.
Works for the mitigation of hydrogeological risk A10 – km 16 + 350. Geovertical takes care of the interventions to protect the Frana and Beo viaduct pile, through the construction of a Berlin micropile.
Geovertical is also involved in the realization of this strategic work for the City of Turin.
The works concern the cortical strengthening of the rocky slope at the Cesaronica Gallery.
Execution of the concrete and carpentry work for reinforced concrete works in the construction site that the Client has in progress for “Doubling of the track of the Bari-Taranto railway line, Mungivacca – Noicattaro section including the stations of Triggiano and Capurso”.
The works, entrusted in a very urgent regime, involved maintenance interventions inside the tunnels present in the network under the responsibility of the 1st Section – Genoa Directorate, in the A26 Genoa Voltri – Gravellana Toce sections and its branches, A10 Genoa – Savona, A12 Genoa – Sestri Levante, A7 Genoa – Serravalle.
The goal – the technicians explain – is to work in close synergy with the contracting authority to maximize the construction of a work whose site falls within a residential area.
The works, entrusted with the utmost urgency to Geovertical, consist in the consolidation of the motorway embankment facing the section of the A12 km. 60, loc. Civitavecchia, affected by a subsidence.
Geovertical will take care of the conveyor belts of the mud, thanks to the consolidated experience in the construction sites for the Brenner Base Tunnel.