Valmontone - 4000 m² di geostuoia su biorete in cocco

Valmontone, installed 4000 m² of geomat

Valmontone, installed 4000 m² of geomatNews – 01 March 2021 In the municipality of Valmontone (RM), Geovertical is carrying out works for the containment of a rocky wall. For cortical strengthening, after the preparatory work, 4000 m² of geomat were laid on coconut bio-mesh, an innovative solution that guarantees good durability and an anti-erosion action.…

Bolzano. Walther Park, tunnel Alto Adige

Bolzano. Walther Park, tunnel Alto Adige

Execution of construction works in reinforced concrete, construction of foundations, walls, floors; and construction of special foundations, such as micropiles, large diameter piles, nailed walls in the construction site for the construction of a new road tunnel in Via Alto Adige in Bolzano, including technical rooms and accessory completions on behalf of the contracting station Walther Park S.p.a.