A10. Work on the viaduct
Works for the mitigation of hydrogeological risk A10 – km 16 + 350. Geovertical takes care of the interventions to protect the Frana and Beo viaduct pile, through the construction of a Berlin micropile.
Works for the mitigation of hydrogeological risk A10 – km 16 + 350. Geovertical takes care of the interventions to protect the Frana and Beo viaduct pile, through the construction of a Berlin micropile.
Geovertical is also involved in the realization of this strategic work for the City of Turin.
The works concern the cortical strengthening of the rocky slope at the Cesaronica Gallery.
Execution of the concrete and carpentry work for reinforced concrete works in the construction site that the Client has in progress for “Doubling of the track of the Bari-Taranto railway line, Mungivacca – Noicattaro section including the stations of Triggiano and Capurso”.