Skip to content
Facebook page opens in new windowLinkedin page opens in new window
  • Contacts
  • Italiano
  • English
top_menu_DX_EN
Search:
  • Italiano
  • English
Lang-Mobile_ITA
Geovertical S.r.l.
Geovertical S.r.l.Geovertical S.r.l.
  • Company
  • Policy areas
  • Certications
  • Projects
  • Carpentry and Facilities
  • News
  • Home
  • Company
  • Certications
  • Policy areas
  • Projects
  • Carpentry and Facilities
  • News
  • Contacts

Monthly Archives: September 2020

You are here:
  1. Home
  2. 2020
  3. September

1st Section Direction – Genoa. Highly urgent works in the tunnel

ProjectsBy Geovertical Srl24 September 2020

The works, entrusted in a very urgent regime, involved maintenance interventions inside the tunnels present in the network under the responsibility of the 1st Section – Genoa Directorate, in the A26 Genoa Voltri – Gravellana Toce sections and its branches, A10 Genoa – Savona, A12 Genoa – Sestri Levante, A7 Genoa – Serravalle.

Avalanche defense. The construction site in the province of Belluno is underway

NewsBy Geovertical Srl19 September 2020

The goal – the technicians explain – is to work in close synergy with the contracting authority to maximize the construction of a work whose site falls within a residential area.

Somma urgenza Civitavecchia

Work with utmost urgency, A12 motorway section loc. Civitavecchia

ProjectsBy Geovertical Srl15 September 2020

The works, entrusted with the utmost urgency to Geovertical, consist in the consolidation of the motorway embankment facing the section of the A12 km. 60, loc. Civitavecchia, affected by a subsidence.

Alta Velocità Tratta Milano-Verona

Milan / Verona. Geovertical works in progress

NewsBy Geovertical Srl15 September 2020

Geovertical will take care of the conveyor belts of the mud, thanks to the consolidated experience in the construction sites for the Brenner Base Tunnel.

Realizzazione di opere di difesa dalla caduta massi - Folignano

Rockfall defense. The numbers of the Folignano yard

NewsBy Geovertical Srl4 September 2020

Seven thousand linear meters of drilling. Fifteen thousand square meters of network and nearly twenty thousand linear meters of cable. These are the numbers of the work carried out by Geoevertical in Folignano for the defense against falling rocks. A hydraulic drilling machine and a manual pneumatic drilling machine were also used for the work.