Santa Barbara. The video of the celebrations
On 4 December last year, at Santa Barbara, the protector of miners and firefighters, and generally of those who work outside the yards
On 4 December last year, at Santa Barbara, the protector of miners and firefighters, and generally of those who work outside the yards
Execution of construction works in reinforced concrete, construction of foundations, walls, floors; and construction of special foundations, such as micropiles, large diameter piles, nailed walls in the construction site for the construction of a new road tunnel in Via Alto Adige in Bolzano, including technical rooms and accessory completions on behalf of the contracting station Walther Park S.p.a.
As part of the suppression of the level crossing located at km 10 + 864 of the Voghera-Pavia line in the municipality of Castelletto di Branduzzo
L’azienda si occuperà dell’esecuzioni di alcuni lavori per conto di CMB, sui cantieri per il raddoppio della linea Ferroviaria Bari- Taranto.
Works for the mitigation of hydrogeological risk A10 – km 16 + 350. Geovertical takes care of the interventions to protect the Frana and Beo viaduct pile, through the construction of a Berlin micropile.
Geovertical is also involved in the realization of this strategic work for the City of Turin.
The works concern the cortical strengthening of the rocky slope at the Cesaronica Gallery.
Execution of the concrete and carpentry work for reinforced concrete works in the construction site that the Client has in progress for “Doubling of the track of the Bari-Taranto railway line, Mungivacca – Noicattaro section including the stations of Triggiano and Capurso”.
The works, entrusted in a very urgent regime, involved maintenance interventions inside the tunnels present in the network under the responsibility of the 1st Section – Genoa Directorate, in the A26 Genoa Voltri – Gravellana Toce sections and its branches, A10 Genoa – Savona, A12 Genoa – Sestri Levante, A7 Genoa – Serravalle.
The goal – the technicians explain – is to work in close synergy with the contracting authority to maximize the construction of a work whose site falls within a residential area.