Client
Anas S.p.a. – Ufficio Autostrada Salerno – Reggio Calabria
Contractor
ITALSARC S.C.P.A.
Subcontractor
GEOVERTICAL S.r.l.
Modernization and adaptation works to type 1 / A of the CNR80 standard from Km 153 + 400 to Km 173 + 900 of the Salerno – Reggio Calabria motorway. Macrolotto 3rd Part 2.
Securing walls and rocky slopes.
DISAGGING: allows to stabilize portions of the wall by unloading dangerous boulders downstream; it is a preparatory phase for the positioning of the nets.
CUTTING OF SHRUBS AND SIMILAR
LAYING OF METAL NETWORKS ON ROCK WALLS: reinforcement of rocky areas by means of the installation of a double-twist hexagonal wire mesh with reinforcement by means of a steel wire armor lattice placed diagonally and passing through special cable gland rings placed on steel bars in perforations armed.